星期四, 26 2 月, 2026
Home PV News 200 MW wind farm to be built by NextEra unit

200 MW wind farm to be built by NextEra unit

Xcel Energy Inc. signed a contract with NextEra Energy Resources LLC, a unit of NextEra Energy Inc. , to build a 200 MW wind farm in eastern Colorado. Construction will begin in early 2012 with an expected completion date in late 2012.


Xcel solicited bids for 200 MW of wind power in January 2009 but ended those bids in November 2010 because market prices for wind power had dropped due to the economic downturn and a surplus of turbines in the U.S. market. The Colorado Public Utilities Commission approved Xcel’s request to issue new bids for the wind power.


The cost of the NextEra wind farm wasn’t disclosed, but Xcel said the price was nearly 40 percent lower than bids offered in the earlier round.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Switch Together Solar scheme returns to help Solihull residents save money and cut carbon

A popular scheme that helps people save money on their energy bills while reducing carbon emissions is returning to Solihull. Switch Together Solar brings residents,...

BOOM Power secures second NSIP consent for Fenwick solar plant

The UK energy secretary Ed Miliband has granted consent for a 237.5MW solar PV plant developed by BOOM Power. The UK-based developer will construct the...

Indian PV manufacturers downplay impact of 125% preliminary US countervailing duty

The US Department of Commerce (DoC) has proposed a 125.87% preliminary countervailing duty (CVD) on imported Indian solar cells. Several Indian PV manufacturers PV Tech...

Scatec signs landmark PPA in Egypt for 1.95 GW Solar and 3.9 GWh BESS capacity

Scatec ASA, a leading renewable energy solutions provider, has signed a Power Purchase Agreement (PPA) with the Egyptian Electricity Transmission Company (EETC) for a...