星期六, 5 9 月, 2026
Home PV News Taos electric cooperative seeks 100 percent daytime solar power

Taos electric cooperative seeks 100 percent daytime solar power

Taos-based Kit Carson Electric Cooperative’s largest solar array to date came online May 14, but the power company is developing two much larger facilities as it seeks to achieve 100 percent daytime solar energy by 2022.

The new 3-megawatt array with more than 12,000 panels is located near the Taos water treatment plant. It is Kit Carson’s 17th solar array and brings its solar power production to 19.8 megawatts or 56 percent of its daytime solar energy, according to a Kit Carson news release.

A 15-megawatt solar array in Taos and a 6-megawatt array in Angel Fire are under development for Kit Carson, which serves companies in Taos, Rio Arriba and Colfax counties.

Local developer ParaSol constructed the three-megawatt array with all local labor. Construction began in October and was financed by the U.S. Department of Agriculture’s Rural Utilities Service.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Westbridge to Exit Alberta Red Willow Solar-BESS

Canada’s Westbridge Renewable Energy said it signed a definitive agreement to sell its Red Willow solar-plus-storage project in Alberta. The transaction would generate total...

Swedish solar manufacturer Midsummer SE gives up to build a solar cell factory in Sweden

Swedish solar manufacturer Midsummer SE (STO:MIDS) has dropped plans to build a solar cell factory in Flen, Sweden, and will decline an EU grant...

MN8 and Eos LDES build 86-MW solar project with BESS

MN8 Energy, Eos Energy Enterprises Inc (NASDAQ:EOSE) and Google have unveiled a partnership to deliver an 86-MW solar project combined with short- and long-duration...

US battery storage installations for 20.2 GWh in Q2

The US energy storage industry deployed a record 20.2 GWh of battery energy storage systems (BESS) in the second quarter of 2026, a 108%...