星期二, 19 5 月, 2026
Home PV News NTPC arm tenders 50 MW (AC) grid-connected solar project in Jharkhand

NTPC arm tenders 50 MW (AC) grid-connected solar project in Jharkhand

March 30 is the last date to bid for the solar capacity tendered by NTPC Vidyut Vyapar Nigam Limited. The project—to be set up on turnkey basis—shall come up at Panchet power station of Damodar Valley Corporation and shall be awarded through domestic competitive bidding followed by reverse auction.

Source:pv magazine

NTPC Vidyut Vyapar Nigam Limited (NVVN) has invited bids to set up a 50 MW grid-connected solar power plant—on ‘design, build, operate and transfer’ basis—at Panchet power station of Damodar Valley Corporation in Dhanbad district of Jharkhand.

The EPC work for the solar project shall be awarded in a single block of 50 MW. The plant shall be developed under Open Category, which means PV cell and modules of any origin can be used. However, models and manufacturers thereof must be included in the “Approved List of Models and Manufacturers” published by the Ministry of New and Renewable Energy.

The selected bidder shall be responsible for the design, engineering, supply, construction, erection, testing and commissioning of the plant. It shall also provide three years of operation and maintenance support, and annual maintenance contract services for critical equipment for a period of ten years.

Setting up of all the necessary infrastructure for connectivity and evacuation of the power generated from the solar project up to 33KV bus at DVC-Panchet switchyard shall be in the scope of the bidder.

Both crystalline silicon (CSi) or thin-film modules are allowed. Crystalline silicon modules should have minimum 300Wp peak power rating and minimum 15% efficiency under standard test conditions.

Thin-film solar cells shall have minimum 110W peak power rating and minimum 15% efficiency under standard test conditions.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Southeast Asia’s Solar Panel Boom

Solar power is booming these days, with 511 GW of new capacity added in 2025 alone. A big reason is because the cost of...

Enfinity lands industrial off-takers for 120 MW of new Italian solar

US-based renewables firm Enfinity Global has secured agreements for 1.8 TWh of electricity supply in Italy under the country’s Energy Release 2.0 mechanism dedicated...

AES Chile expands Latin America’s largest solar and storage hub

AES Chile has announced the start of operations of Andes Solar III, located in the Antofagasta Region, as it continues to expand its Andes...

Solar panels won’t slash energy bills on their own – an expert explains how to maximise savings

Energy bills in the UK are still expected to rise in the coming months, putting more pressure on household budgets despite the shaky ceasefire...