星期一, 三月 30, 2020
Home PV News Gujrat Urja Vikas Nigam issues tender for 700MW of solar power

Gujrat Urja Vikas Nigam issues tender for 700MW of solar power

The plants will be located in the state of Gujrat, in the 1GW Dholera Solar Park on a build-own-operate basis

Gujrat Urja Vikas Nigam (GUVNL) is re-tendering 700MW of solar power capacity that will be located in the 1GW Dholera Solar Park, in the Indian state of Gujrat.

GUVNL is set to enter a power purchase agreement (PPA) for a period of 25 years – bidders can quote a maximum tariff of $0.038 (£0.032).

The auction of 300MW capacity has already been completed and only 14 plots with 50MW capacity each are yet to be bid upon.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Solar Alliance completes rooftop installation of 2-part, 519-kW array

Solar Alliance Energy has completed the rooftop portion of the 519-kW solar system currently under construction for a division of Onni Group at Manhattan Beach...

Covid-19 to wreck economics of new solar and wind projects

The movements in the foreign exchange market triggered by the spread of Covid-19 will impact all segments of the renewables market. According to Norwegian...

Arizona commission signals support for 100% clean energy by 2050

The Arizona Corporation Commission has directed its staff to develop a set of rules to achieve 100% clean energy by 2050, said Commission Chair...

Covid-19: MNRE terms utility-scale solar power generation ‘essential service,’ allows related material and personnel movement

The Ministry of New and Renewable Energy (MNRE) has asked states to permit movement of staff, vehicles and material required for operation of utility-scale solar plants...