星期四, 5 6 月, 2025
Home PV News AES projects 2011 start date for Changuinola I hydropower plant in Panama

AES projects 2011 start date for Changuinola I hydropower plant in Panama

AES's 223-MW Changuinola I hydro plant in Panama is set to begin commercial operations in the first half of next year, wire services reported.

The plant will use water from the Changuinola River in Bocas del Toro province.


AES Panama is the country's largest hydro generator, with installed capacity of 482 megawatts.


In other news, Brazil's 210-MW Serra do Facao hydropower plant is projected to come online within three months, the president of project developer Serra do Facao Energia consortium told wire services.

The Serra do Facao hydro project initially was planned to come online in October 2010.

The plant is located in the Brazil's center-western state of Goias.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Analysis: UK’s solar power surges 42% after sunniest spring on record

The UK’s solar farms and rooftops generated more electricity than ever before in the first five months of 2025, as the country enjoyed its...

Envision Energy Partners with SUN Terra to Build Full-Chain Energy Storage Ecosystem

Envision Energy, a global leader in green technology, announced a strategic partnership with SUN Terra, Indonesia's leading renewable energy company, to advance collaboration on energy storage...

BRICS Industrial Innovation Contest 2025 Energy Electronics Industry Track Tryout Officially Launches

On the afternoon of May 29, the press conference for the 2025 BRICS Industrial Innovation Contest Energy Electronics Industry Track Tryout (referred to as...

Aramco’s Renewable Energy Breakthrough: Flow Battery Powers Gas Production

Aramco has achieved a global milestone by commissioning a megawatt-scale renewable energy storage system, using an Iron-Vanadium (Fe/V) flow battery to power gas production...