Warning: getimagesize(): SSL operation failed with code 1. OpenSSL Error messages: error:14090086:SSL routines:ssl3_get_server_certificate:certificate verify failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(): Failed to enable crypto in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(https://www.pv366.com/wp-content/uploads/2019/12/International-PV-272-90-tm-1.png): failed to open stream: operation failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(): SSL operation failed with code 1. OpenSSL Error messages: error:14090086:SSL routines:ssl3_get_server_certificate:certificate verify failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(): Failed to enable crypto in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(https://www.pv366.com/wp-content/uploads/2019/12/International-PV-logo-320.png): failed to open stream: operation failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782
星期五, 八月 7, 2020
Home PV News Tata Power to develop 100 MW solar project in Maharashtra

Tata Power to develop 100 MW solar project in Maharashtra

The Maharashtra project is the developer’s second large-scale solar win this month following a 120 MW project in Gujarat. The electricity generated will be supplied to Maharashtra State Electricity Distribution Co. Ltd (MSEDCL) under a 25-year power purchase agreement.

Source:pv magazine

Tata Power Renewable Energy Limited (TPREL)—an arm of integrated power company Tata Power—has received a Letter of Award  from Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)  to develop a 100 MW solar project in Maharashtra.

The electricity produced from the plant will be supplied to MSEDCL under a power purchase agreement (PPA), valid for a period of 25 years from the scheduled commercial operation date.

The company won this capacity in a Phase V auction by MSEDCL in December last year.

The project is required to be commissioned within 18 months from the date of execution of the PPA.

The plant is expected to generate about 240 million units of electricity per year and will annually offset approximately 240 million Kg of CO2.

With this award, Tata Power’s renewable capacity will increase to 3,557 MW, out of which 2,637 MW (932 MW wind and 1705 MW solar) is operational and 920 MW under implementation including 100 MW won under this LOA.

The MSEDCL project is the developer’s second large-scale solar win this month, following a 120 MW project from Gujarat Urja Vikas Nigam Limited (GUVNL).

The electricity generated from 120 MW project in Gujarat will be supplied to GUVNL under a power purchase agreement (PPA), valid for a period of 25 years from the scheduled commercial operation date.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

The PV world 10 years ago – Summer Series Part III

Global The prospects for the international PV market were very positive in 2010, with significant growth anticipated. According to a statement published by iSuppli before...

Solar Inventions new module manufacturing technique increases power output while reducing silver

Solar Inventions has released a white paper with the first scientific details on its patent-pending new architecture for solar cells, which won the first...

Solar tile with passive cooling

Researchers from Australia’s Western Sydney University have created a solar tile that includes phase-change materials (PCM) with a cooling function. They built the device...

University of Illinois adding 12.1-MW solar array to Urbana-Champaign campus

Construction is underway at the University of Illinois at Urbana-Champaign’s Solar Farm 2.0, with a commercial operation date expected for early 2021. The new...