Warning: getimagesize(): SSL operation failed with code 1. OpenSSL Error messages: error:14090086:SSL routines:ssl3_get_server_certificate:certificate verify failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(): Failed to enable crypto in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(https://www.pv366.com/wp-content/uploads/2019/12/International-PV-272-90-tm-1.png): failed to open stream: operation failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(): SSL operation failed with code 1. OpenSSL Error messages: error:14090086:SSL routines:ssl3_get_server_certificate:certificate verify failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(): Failed to enable crypto in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782

Warning: getimagesize(https://www.pv366.com/wp-content/uploads/2019/12/International-PV-logo-320.png): failed to open stream: operation failed in /home/pv366/wp-content/plugins/td-cloud-library/shortcodes/header/tdb_header_logo.php on line 782
星期五, 八月 7, 2020
Home PV News CS Energy Announces Completion of the Largest Landfill Solar-Plus-Storage Project in Massachusetts

CS Energy Announces Completion of the Largest Landfill Solar-Plus-Storage Project in Massachusetts

Source:Altenergy

CS Energy, LLC, a leading integrated energy firm that designs and builds optimized projects in the solar, storage and emerging energy industries, announced its successful completion of a 4.5 MWdc solar project installed with a 3.8 MWh lithium-ion storage solution on a landfill cap site located in Amesbury, Massachusetts. The largest solar-plus-storage system to be completed to date is part of a partnership between the City of Amesbury and Kearsarge Energy, an award-winning New England based renewable energy developer and financier who is actively building out its energy storage portfolio.

With close to 1 GW of solar installed to date, including over 160 MW of landfill solar installations, CS Energy is a leading engineering, procurement, and construction (EPC) company. The organization is ranked in the top 20 Solar Contractors in the US by Solar Power World and named the #1 commercial solar installer by Wood Mackenzie with leading market share in Massachusetts, New York and New Jersey. This project was one of the first solar plus energy storage projects to participate in the Solar Massachusetts Renewable Target (SMART) Program.

“CS Energy has a significant market share in the solar-plus-storage business. We are strategically scaling up our energy storage division and growing our register of successfully completed projects,” shared Sean Harrington, Director of Energy Storage of CS Energy. “Our background and experience in landfill solar enable us to foresee challenges and expedite projects. It’s another testament to our energy storage team’s capabilities and dedication.”

“As the owner and operator of the Amesbury landfill project, it was critical that Kearsarge Energy partner with a sophisticated and experienced EPC firm capable of navigating the complexities of landfill solar projects,” said Andrew the Bernstein, Managing Partner of Kearsarge Energy. “CS Energy’s reputation and extensive experience in this specific field, along with its commitments to quality and safety, made the project an unequivocal success.”

CS Energy is a market leader with over 130 MWh of energy storage projects installed or underway in four states. Designing and constructing the Amesbury solar plus storage system required experience in building projects within the allowable limits of the cap design, as well as with the allowable limits of the Department of Environmental Protection’s (DEP) Post-Closure Use Permit (PCUP). The firm’s advanced capabilities and extensive onsite overview enabled the project to meet critical PCUP requirements, including not exceeding the 7-psi ground pressure limit for all activities on the landfill cap. Each construction activity, delivery, and the battery energy storage system was evaluated and designed by CS Energy and approved by an independent engineer for DEP compliance. The result of these efforts is a well-designed solar-plus-storage system that will generate clean, renewable energy (from a previously unusable site) for decades to come.

The Amesbury project went live in January 2020 and is expected to produce 5,600 MWh of electricity each year.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

The PV world 10 years ago – Summer Series Part III

Global The prospects for the international PV market were very positive in 2010, with significant growth anticipated. According to a statement published by iSuppli before...

Solar Inventions new module manufacturing technique increases power output while reducing silver

Solar Inventions has released a white paper with the first scientific details on its patent-pending new architecture for solar cells, which won the first...

Solar tile with passive cooling

Researchers from Australia’s Western Sydney University have created a solar tile that includes phase-change materials (PCM) with a cooling function. They built the device...

University of Illinois adding 12.1-MW solar array to Urbana-Champaign campus

Construction is underway at the University of Illinois at Urbana-Champaign’s Solar Farm 2.0, with a commercial operation date expected for early 2021. The new...