星期四, 15 1 月, 2026
Home PV News Asia Canadian Solar Announces Commercial Operation of Three Solar Projects in Japan

Canadian Solar Announces Commercial Operation of Three Solar Projects in Japan

Canadian Solar Inc. says three of its Japanese solar power projects totaling 42 MW (Oita Kitsuki, Gunma Takasaki and Yamaguchi Hofu) have reached commercial operation.
The projects are powered by Canadian Solar bifacial BiHiKu modules. The expected generated energy was purchased under Japan’s feed-in-tariff program for approximately 19 years at the rates of JPY32 (US $0.24), JPY14.49 (US $0.11), and JPY14.25 (US $0.10) per kilowatt-hour. Together, these projects are set to produce about 53,000 MWh of renewable energy that will power approximately 15,000 households, avoiding an estimated 24,000 tons of annual carbon emissions.
“The Oita Kitsuki project was our first project where we installed a static synchronous compensator (STATCOM), a more challenging power quality requirement that will meaningfully help improve the grid’s reliability given the growing number of interconnected solar farms,” says Dr. Shawn Qu, Canadian Solar’s chairman and CEO.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Scatec signs landmark PPA in Egypt for 1.95 GW Solar and 3.9 GWh BESS capacity

Scatec ASA, a leading renewable energy solutions provider, has signed a Power Purchase Agreement (PPA) with the Egyptian Electricity Transmission Company (EETC) for a...

European Investment Bank finances $150m Egyptian solar farm

The global development arm of the European Investment Bank (EIB) has announced a $150m loan to finance the Obelisk solar photovoltaic project in Qena,...

Iran Approves 100GW Solar Power Projects

Recently, Jafar Mohammadi Nejad Sijaroudi, Deputy Director of Investment at Iran’s Renewable Energy and Energy Efficiency Organization (SATBA), confirmed that the country has issued...

INDIA’S PLI DRIVES GROWTH IN SOLAR MANUFACTURING SECTOR: REPORT

The report says that most of the progress will depend on sustained policy coherence, capital mobilisation and upstream integration India’s Production-linked incentive (PLI) for high-efficiency...