星期二, 17 6 月, 2025
Home PV News Adani SECOL commissions 50 MW solar power plant in Uttar Pradesh

Adani SECOL commissions 50 MW solar power plant in Uttar Pradesh

The plant has a 25-year power purchase agreement with the Uttar Pradesh Power Corporation Ltd (UPPCL) at Rs 3.07 per kilowatt hour

Source:Energyword

Adani Solar Energy Chitrakoot One Ltd (ASECOL), a subsidiary of Adani Green Energy Ltd (AGEL), has commissioned a 50 megawatt solar power plant at Chitrakoot in Uttar Pradesh.
The plant has a 25-year power purchase agreement with the Uttar Pradesh Power Corporation Ltd (UPPCL) at Rs 3.07 per kilowatt hour.
The commissioning takes AGEL’s total operational renewable capacity to 3,520 MW, a step closer to its vision of 25 GW capacity by 2025.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Analysis: UK’s solar power surges 42% after sunniest spring on record

The UK’s solar farms and rooftops generated more electricity than ever before in the first five months of 2025, as the country enjoyed its...

Envision Energy Partners with SUN Terra to Build Full-Chain Energy Storage Ecosystem

Envision Energy, a global leader in green technology, announced a strategic partnership with SUN Terra, Indonesia's leading renewable energy company, to advance collaboration on energy storage...

BRICS Industrial Innovation Contest 2025 Energy Electronics Industry Track Tryout Officially Launches

On the afternoon of May 29, the press conference for the 2025 BRICS Industrial Innovation Contest Energy Electronics Industry Track Tryout (referred to as...

Aramco’s Renewable Energy Breakthrough: Flow Battery Powers Gas Production

Aramco has achieved a global milestone by commissioning a megawatt-scale renewable energy storage system, using an Iron-Vanadium (Fe/V) flow battery to power gas production...