星期二, 3 6 月, 2025
Home PV Project Japan Atomic Power to Shut Tsuruga Reactor to Repair Pump Fault

Japan Atomic Power to Shut Tsuruga Reactor to Repair Pump Fault

Japan Atomic Power Co. said it will shut its No. 1 Tsuruga nuclear reactor today after discovering a fault at a water-circulating pump.


The company will close the reactor for an unspecified period to inspect the pump, and fix it if required, Japan Atomic Power said in a statement in Tokyo.


The 357-megawatt reactor started low-capacity operations on Sept. 1 as part of routine maintenance that was due to end by late this month. The unplanned pump inspection will force Japan Atomic Power to extend the maintenance period, it said in the statement.


The reactor is located at Tsuruga, a city in Fukui prefecture.


 


———————————————————–
UNIT                     LOCATION   MW    STATUS
———————————————————–
Japan Atomic Power Co.
Tokai              No. 2 Ibaraki    1,108 Running
Tsuruga            No. 1 Fukui        357 To shut
                   No. 2            1,160 Shut
————————————————————

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

BRICS Industrial Innovation Contest 2025 Energy Electronics Industry Track Tryout Officially Launches

On the afternoon of May 29, the press conference for the 2025 BRICS Industrial Innovation Contest Energy Electronics Industry Track Tryout (referred to as...

Aramco’s Renewable Energy Breakthrough: Flow Battery Powers Gas Production

Aramco has achieved a global milestone by commissioning a megawatt-scale renewable energy storage system, using an Iron-Vanadium (Fe/V) flow battery to power gas production...

Jinko unveils 520 kWh C&I battery storage system

Jinko ESS has unveiled its Dolphin 520 kWh commercial and industrial battery energy storage system (BESS), designed to address the complex power needs of...

Trina Storage Earns Sixth Consecutive BloombergNEF Tier 1 Ranking in Q2 2025

Trina Storage has been named as the Global Tier 1 Energy Storage Manufacturer in BloombergNEF (BNEF)'s Energy Storage Tier 1 List for Q2 2025....