星期五, 6 6 月, 2025
Home PV News CEZ Esco Bulgaria to finish building solar park for National-7 in May

CEZ Esco Bulgaria to finish building solar park for National-7 in May

Source:SeeNews

CEZ Esco Bulgaria is expected to complete the construction of a 307 KWp solar park for local wood pellets producer National-7 in May, CEZ Bulgaria said.

The solar park, located in National-7’s production base in the village of Skravena, is expected to generate some 400 MWh of electricity annually, CEZ Bulgaria said in a statement on Sunday.

In the three years since its establishment, CEZ Esco Bulgaria has worked on 53 projects, of which 20 for the construction of solar parks with a total capacity of 3.4 MWp.

National-7’s plant has a production capacity of 20,000 tonnes of wood pellets per year.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -

Most Popular

Analysis: UK’s solar power surges 42% after sunniest spring on record

The UK’s solar farms and rooftops generated more electricity than ever before in the first five months of 2025, as the country enjoyed its...

Envision Energy Partners with SUN Terra to Build Full-Chain Energy Storage Ecosystem

Envision Energy, a global leader in green technology, announced a strategic partnership with SUN Terra, Indonesia's leading renewable energy company, to advance collaboration on energy storage...

BRICS Industrial Innovation Contest 2025 Energy Electronics Industry Track Tryout Officially Launches

On the afternoon of May 29, the press conference for the 2025 BRICS Industrial Innovation Contest Energy Electronics Industry Track Tryout (referred to as...

Aramco’s Renewable Energy Breakthrough: Flow Battery Powers Gas Production

Aramco has achieved a global milestone by commissioning a megawatt-scale renewable energy storage system, using an Iron-Vanadium (Fe/V) flow battery to power gas production...