Mecpower Solutions and Navitas Solar have agreed to build a battery energy storage manufacturing plant with 5 GWh of annual capacity in Karjan, Gujarat.
Output is due to start in the first quarter of fiscal 2027-28. Construction is already under way, including boundary work, and orders for production-line equipment have been placed. Completion is targeted for March or April 2027, with the first battery container scheduled to ship in April 2027.
The line is designed for roughly 1,000 containers a year, initially in 5 MWh and 6 MWh configurations, aimed mainly at utility-scale work such as standalone storage and solar-plus-storage projects.
The partnership pools Mecpower’s project development, engineering and execution experience with Navitas Solar’s integrated manufacturing know-how, and builds on an existing commercial relationship between the two. Output is expected to serve both companies’ EPC and utility-scale pipelines as well as third-party demand.
Setul Shah, a director at Mecpower Solutions, called the plant a strategic move across the storage value chain. Navitas director Ankit Singhania said domestic manufacturing would strengthen India’s clean-energy supply chain as storage becomes central to integrating solar.





